Own the build.
Inherit the record.
Your BESS isn't a transaction at handover. It's a 40-year operating commitment. SureWorx gives owners a single platform across procurement, construction, commissioning and operations, so the record that clears finance, insurance and grid registration is the record you run the asset on.
Inherit a working dataset,
not a folder of PDFs.
When a project hands over to operations, owners typically receive thousands of disconnected documents. SureWorx replaces that with a structured, queryable record of every asset, every test and every signoff. Sealed as it happened.
Verified handover
Every certificate, test pack and ITP traceable to the engineer, time and location it was signed.
Portfolio visibility
Roll up risk, compliance and capex performance across every site, contractor and asset class.
Insurance-ready evidence
Share construction quality and operational data with insurers to unlock better premiums.
From breaking ground
to grid-export.
Procurement, construction, commissioning, operations. Most owners stitch four tools across these phases. SureWorx is one, and the asset record never resets between them.
Procurement
Tender, award and contract. Every decision linked to the asset it builds.
Construction
Field capture, QA, HSE and sub-contractors. Evidence sealed as work happens.
Commissioning
ITPs, tests and the digital handover package you specified at award.
Operations
Lifecycle, risk and insurance. Run on the as-built truth for 30+ years.
Asset Mgmt·EAPM·HSE·Quality·Third-Party·Tendering· every operating module, from the owner seat
One record · owner-visible from day one
Three control layers,
whole portfolio.
Risk, tasks and documents cut horizontally across every vertical, so your construction risks become operating risks, your punch list becomes a work order, and your evidence stays queryable for the life of the asset.
- ✓Risk managementOne register for construction, asset, safety, quality and third-party risks. Owner-visible from day one.
- ✓Task & action managementConstruction snags become operations work orders. Same record, same evidence, no handover loss.
- ✓Document managementDrawings, certificates, procedures and obligations. Versioned and queryable for 30+ years.
Walk into your next handover
with a 360° view.
See an owner-side demo with one of our infrastructure specialists. Bring a live project and we'll show you the record your EPC should be building for you.