Interconnect on schedule.
Energise on evidence.
Grid interconnection is where COD is won or lost: connection agreements, generator performance standards, staged energisation, hold-point tests and registration. SureWorx turns the whole program into a living digital twin of your obligations, so the evidence the network and market operator need is ready before they ask. Born in one of the most demanding connection regimes in the world, Australia's NEM. Built for any grid.
The longest gate between
built and earning.
Between mechanical completion and commercial operation sits the interconnection program: performance standards to demonstrate, hold points to clear, models to validate, registrations to complete. Every week saved there is a week of revenue. SureWorx makes the evidence the fast path, not the bottleneck.
Obligations become a register
Connection agreements and performance standards decompose into structured obligations, each mapped to the tests and evidence that discharge it.
Hold points clear on arrival
Witness tests, ITPs and protection settings assembled and sealed before the inspector is on site. No resubmission loops.
The model matches the machine
Version-controlled PSCAD and PSS®E model releases, benchmarking runs and validation artefacts live in one record, so the model you submitted is provably the plant you energise.
One digital process,
application to market.
Four stages, one record. The evidence that clears each gate compounds into the next, and into operations.
Connection application
Studies, agreements and conditions captured as structured, trackable obligations from day one.
Performance standards
Your generator performance standards decomposed clause by clause, each mapped to the studies, tests and evidence that prove it.
Staged energisation
Hold points, witness tests and protection settings sealed at each stage, ready for signoff.
Registration & market
Registration data packages and compliance evidence assembled from the record, with the paper trail intact.
Obligations·Model Validation·Hold Points·Witness Tests·Protection Settings·Registration· part of the SureWorx assurance layer
Live assurance · beyond COD
Interconnection assurance
doesn't stop at COD.
Performance standards are obligations for the life of the connection. SureWorx keeps assessing them the way it did during commissioning: live, from the operating record, with every control exercised by the digital process that runs the work.
- ✓A living obligations registerEvery connection condition tracked with its evidence, owner-visible for the life of the asset.
- ✓Drift caught earlySettings changes, firmware updates and augmentation assessed against the standards before they become compliance findings.
- ✓Reconnection-readyWhen you augment or repower, the evidence base for the new application already exists.
- ✓One record for every reviewerThe network operator, the independent engineer and the lender read the same tamper-evident evidence, so releases are argued once, on facts.
Bring your connection program.
We'll map the gates.
A working session against your interconnection schedule. Bring your performance standards; walk away with the obligation map, the evidence gaps and the weeks you can pull back.