Storage powers our grid.
One use case, end to end: how a grid-scale battery project gets delivered on SureWorx, and what the owner, the EPC and the insurer each see along the way.
One platform.
Every phase.
Grid-scale BESS with SureWorx. Delivered with quality, safety and risk evidence captured as the work happens, not reconstructed after it.
From first land study to year twenty of dispatch, owner, EPC and insurer work from the same record, each through their own lens.
Every step of the journey below runs on a SureWorx module. Look for the tags inside each card:
Build it with certainty.
Follow a 200 MW / 400 MWh reference project through five phases, and watch the evidence record grow with the asset.
Scroll to Phase 1Site &
feasibility.
Confirm the land, the grid connection and the business case, with every study, approval and obligation captured from day one.
Keep scrolling
Phase 1 · Prove the site
Confirm the fundamentals. Connection capacity, land constraints and community support.
Grid Connection Assessment
Screen capacity at the point of interconnection and flag network constraints before committing capital to the site.
AssuranceLand & Environmental Studies
Planning, environmental, heritage, flood and fire assessments. Tracked with owners, due dates and the evidence attached.
Document ManagementCommunity & Stakeholders
Engage landholders, councils and neighbours early. Log commitments and keep every undertaking auditable.
Document ManagementPhase 1 · Open the connection
Start formal engagement with the network operator and build the revenue case.
Network Operator Engagement
Run connection enquiries and applications with the network service provider. One register of submissions, RFIs and responses.
Third-Party ManagementPower System Studies
System strength, fault level and harmonics studies. Versioned, reviewed and traceable into the connection agreement.
Quality ManagementRevenue & Dispatch Case
Model arbitrage, ancillary services and capacity revenue across the asset's life, with the assumptions on the record.
AssurancePhase 1 complete · feasibility evidence banked
The site stacks up.
Now buy it well.
Scroll to Phase 2
Procure &
contract.
Source the technology and the partners, and turn every promise into an obligation you can govern.
Keep scrolling
Phase 2 · Run the RFx
Issue structured tenders and score suppliers on more than price.
Battery System RFx
Tender cells, enclosures, PCS and balance of plant in one workspace. Questions, addenda and submissions in a single trail.
Tendering & ProcurementSupplier Due Diligence
Score bidders on bankability, safety record, certifications and factory-audit results before they make the shortlist.
Third-Party ManagementEvaluation & Award
Weighted scoring, clarification rounds and award decisions. Preserved end to end for governance and finance.
Tendering & ProcurementPhase 2 · Contract the delivery
Execute the contracts, then govern what they actually commit you to.
EPC & Supply Contracts
Extract milestones, liquidated damages and obligations from executed contracts into live registers your team works from.
Document AgentWarranty & LTSA Terms
Capture performance guarantees, degradation curves and service obligations for the next twenty years of operation.
Document ManagementInsurance & Financial Close
Give insurers and lenders structured, verifiable evidence for construction and operational covers, not folders of PDFs.
Provenance EnginePhase 2 complete · obligations under governance
Contracts signed.
Time to move dirt.
Scroll to Phase 3
Construct &
commission.
Build it once, build it right. Every lot, test and signoff recorded as the work happens.
Keep scrolling
Phase 3 · Control the site
Run safe, sequenced works across civil, DC, AC and HV scopes.
Civil & Electrical Works
Track lots, ITPs and hold points across every work front, no signoff, no progress.
Quality ManagementPermits & Safe Work
Digital permits, SWMS and verified competencies for every crew on site, every day.
HSE ManagementLogistics & Receipt
Container deliveries, storage conditions and serial-level receipt inspection from factory to foundation.
Asset ManagementPhase 3 · Prove the quality
Acceptance testing that builds the handover dossier as you go.
FAT & SAT
Factory and site acceptance tests with structured results, punch items and witness signoffs.
Quality ManagementNCRs & Punch Lists
Raise, disposition and close non-conformances before they become latent defects under warranty.
Quality ManagementCommissioning Evidence
Cold and hot commissioning captured test-by-test. The asset is born with its history attached.
Provenance EnginePhase 3 complete · handover dossier building itself
Built and tested.
Ready for power.
Scroll to Phase 4
Energise &
ramp.
Connect to the grid and step up to full export, with compliance proven at every hold point.
Keep scrolling
Phase 4 · Switch on
Energise safely and demonstrate what the connection agreement requires.
Energisation & Protection
HV energisation with protection and control testing certified and on the record.
Quality ManagementGrid Compliance Tests
Demonstrate frequency, voltage and ramp-rate capability against your connection requirements.
Document ManagementStaged Export Ramp
Hold-point evidence at each export step. Visible to owner, EPC and network operator alike.
Provenance EnginePhase 4 · Hand it over
Close out to practical completion with nothing buried.
Punch & Defects Closeout
Work down open items with owners, due dates and photographic evidence.
Quality ManagementPractical Completion
Handover with a complete, queryable record, not boxes of binders.
Asset ManagementRegistration & Market Entry
Finalise registrations and market participation with the paper trail intact.
Document ManagementPhase 4 complete · exporting at full capacity
Online and earning.
Now keep it that way.
Scroll to Phase 5
Operate &
augment.
Twenty-plus years of dispatch, maintenance, warranty and augmentation, all on the same record the asset was born with.
Keep scrolling
Phase 5 · Run the asset
Deliver reliable dispatch while safety and maintenance stay ahead of the fleet.
Maintenance & Inspections
Preventive programs, thermal inspections and work orders against every enclosure, rack and PCS.
Asset ManagementIncident & Emergency Readiness
Thermal-event response plans, drills and investigations. Safety as a system, not paperwork.
HSE ManagementWarranty & Degradation
Track state of health against guaranteed curves and build claims from operating evidence.
Asset ManagementPhase 5 · Plan the next twenty years
Make augmentation, insurance and end-of-life decisions on real history, not folklore.
Augmentation Planning
Model capacity additions against real degradation data and grid headroom.
AssuranceInsurance & Compliance Evidence
Keep underwriters and regulators satisfied with live, verifiable operational evidence.
Provenance EngineInside
the asset.
The site is at full export. Step inside and see what SureWorx tracks in an operating BESS.
Keep scrolling
Operating asset · what we track
Every system below carries its own register, inspections and live evidence.
Battery Enclosures & BMS
Racks, modules and battery-management telemetry. Serials, firmware and state of health per unit.
Asset ManagementPCS & Inverters
Conversion equipment with its own maintenance schedule, alarm history and performance record.
Asset ManagementMV & HV Plant
Transformers, switchgear and the substation. Inspections, oil tests and protection settings under control.
Asset ManagementSCADA & EMS
Control-system telemetry joined to the operational record. Alarms become assigned actions.
AI IntelligenceFire Detection & Suppression
Detection, suppression and deluge systems with testing regimes that never lapse.
HSE ManagementSite, Civil & Security
Fencing, drainage, access and security. The unglamorous assets that fail audits.
Asset ManagementThree perspectives.
One record.
The same journey looks different depending on where you sit. SureWorx gives each party their own lens over a single, shared evidence record.
Operate & protect
Asset Owner
You own the BESS for its full life. You need certainty that what you commissioned is what you operate.
For owners & operatorsDeliver & handover
EPC Contractor
You engineer, procure and construct. You need real-time control of scope, schedule and field execution.
For EPC & head contractorsSee your project
on SureWorx.
Tell us where your project is in the journey and we'll walk you through the platform with your phase, your contracts and your risks in mind.
Prefer to talk it through? Book time with us
Pick a time that suits you. Thirty minutes, on your project: whether you're an owner, a builder or an insurer, we'll show the platform working on your phase, your contracts and your risks.
Booked straight into our calendar. No forms, no waiting.